However contractor is also required to work out shifting, installation, testing, commissioning of existing electrical facilities which are not described in above scope. 但也要求承包商设计既有电气设施的移动、安装、测试及调试,这些在上述范围内未说明。
The contractor has to assess the capacity& back up by considering the new facilities along with the shifting and connecting the existing facilities. 承包商须考虑建造新设施以及移动和连接现有设施从而评估电容和备用能力。